How soon must the second coat of rod finish be applied after the first coat. I’m using the Flex Coat Lite –
Typically 24-48 hrs. Longer than that you will need to buff the setup coat to insure that both coats bond. Allyn
How soon must the second coat of rod finish be applied after the first coat. I’m using the Flex Coat Lite –
Typically 24-48 hrs. Longer than that you will need to buff the setup coat to insure that both coats bond. Allyn