+ Reply to Thread
Results 1 to 2 of 2

Thread: Applying 2nd coat of Rod Finish

  1. #1
    Join Date
    Jan 2006
    Location
    Northern California
    Posts
    465

    Default Applying 2nd coat of Rod Finish

    How soon must the second coat of rod finish be applied after the first coat. I'm using the Flex Coat Lite --

  2. #2
    Join Date
    Mar 2005
    Location
    Pueblo West, CO
    Posts
    128

    Default

    Typically 24-48 hrs. Longer than that you will need to buff the setup coat to insure that both coats bond. Allyn

+ Reply to Thread

Similar Threads

  1. Applying head cement
    By RHenn in forum Fly Tying
    Replies: 16
    Last Post: 03-01-2017, 05:18 PM
  2. Flex coat OEM rod builder
    By Bedlam in forum Rod Building: Cane and Graphite
    Replies: 4
    Last Post: 12-19-2012, 11:16 PM
  3. Applying Epoxy to wraps
    By Orthoman in forum Rod Building: Cane and Graphite
    Replies: 3
    Last Post: 04-29-2009, 09:53 AM
  4. New dilema with Flex coat
    By ET custom flyrods in forum Rod Building: Cane and Graphite
    Replies: 12
    Last Post: 09-18-2008, 07:08 PM
  5. Finish coat, wraps, and Ledging Problem
    By Orthoman in forum Rod Building: Cane and Graphite
    Replies: 2
    Last Post: 01-29-2006, 10:45 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts