Drain cover is now done. Added lower trim wood to it and a urethane finish to all the wood surfaces to give it a nice clear coat shine. The trout boarder came in earlier than expected so started putting that up yesterday as well. Also installed a new T12 48" twin tube light next top the stairs. Picking up the drywall in just a little bit so I can start the other wall tonight.