The Tenkara Guides LLC crew have been experimenting with a tapered twisted fluorocarbon line mated to a 9' 5X western tapered leader. It is a cool concept that provides super ninja stealthy presentation. The total line length is about 22-24 ft. I am still working on finding the optimum base line section weight to get the best turnover and overall performance of the line. Going to spend the next couple of months tweaking this concept.
John
Tenkara Guides LLC