Using a tenkara rod adds another element into the calculation, though. Since there is no reel or drag, the tippet has to be the weak link and must break before the rod does. I'm not at all sure his rod is strong enough to stand up to a 10 pound pull. I wouldn't use 2X with any of my rods.




Reply With Quote