According to TDOT, this bridge is being repaired/replaced with the access to the parking lot at the bridge closed until the end of June. This leaves Ferris Creek as the main access point for this tail water. I suggest that plans to use the parking lot be considered tentative for at least a couple of minths after that, to allow for delays.

Ed