Thinking of some of the holes on the stretch of the Hooch I am most likely to use the toon on I'm thinking about 25 - 30 ft. of 3/8 line through the mfgr. installed pulley into 1" pvc tubing to a pulley on the left foot rest to a cleat on the left side of the frame just forward of the seat. I may add a short piece of 1/4 in. cord with a piece of flexible rubber tubing at the end at a 90 deg. angle and a plastic ball or bottle with a 1/2 eye bolt on the line between the anchor and the first pulley so if I have to release the line the ball or bottle would float the end of it and let someone recover it.

I just thought up the bottle idea, your opinion appreciated.